See related products
See related products
Are there any UK government grants or incentives for getting a biomass system?
Are there any government incentives or grants available for installing biomass systems in the UK?
Yes, the UK government supports biomass heating through funding programmes and strategy-driven initiatives, although direct homeowner grants for biomass systems are currently limited compared to other renewables. The focus is on sustainable feedstock development and larger-scale projects.
Key opportunities for homeowners and businesses
- Biomass Feedstocks Innovation Programme: £36 million allocated to develop sustainable biomass supply chains. While targeting innovators, small businesses can collaborate on feedstock production (e.g., local wood waste processing).
- Boiler Upgrade Scheme: Replaced the Renewable Heat Incentive (RHI) in 2022, but biomass systems are typically not eligible unless replacing fossil fuel systems in rural areas with no gas grid.
- Energy efficiency grants: Biomass may qualify under broader schemes like ECO4 or local authority funding if linked to fuel poverty reduction, though this is case-specific.
Recent policy context
The 2023 Biomass Strategy prioritises large-scale BECCS (Bioenergy with Carbon Capture and Storage) for power generation, but recognises biomass heating’s role in sectors that are hard to reduce emissions. New subsidies from 2027-31 for large plants like Drax indicate a focus shift toward industrial applications.
Practical considerations
- Eligibility: Most current incentives favour industrial/commercial users. Homeowners should verify system specifications with accredited installers (MCS-certified).
- Costs: New biomass boilers typically cost £13,000-20,000 installed. Pellet systems generally qualify more easily than log-based ones.
- Sustainability requirements: All biomass systems must use feedstock meeting UK sustainability criteria (chain of custody certification).
Common pitfalls
- Assuming automatic eligibility - Many assume biomass qualifies for BUS; reality requires strict criteria checks.
- Underestimating compliance costs - Sustainability documentation and emissions standards (e.g., 30g/kg particulate limits) add hidden costs.
- Oversizing systems - Installers often recommend excessive capacity to qualify for legacy incentive thresholds, increasing fuel costs.
Expert recommendation
Consult HETAS-certified professionals to navigate the evolving policy landscape. Monitor upcoming schemes as the 2023 Biomass Strategy implementation progresses, particularly for hybrid systems combining solar thermal/biomass.