top of page

See related products

See related products

How often should I update or maintain energy automation systems?

How often do energy automation systems need to be updated or maintained?

Energy automation systems like solar charge controllers or smart battery setups typically require software updates every 6-12 months and hardware checks every 1-2 years. However, the UK’s evolving grid policies and technical requirements mean you may need to adjust this schedule based on regulatory changes or system performance.


Key factors affecting maintenance frequency

1. Rule changes for grid services

UK frequency response services (e.g., Dynamic Containment) are undergoing reforms, including new penalties for non-compliance (effective November 2024). Systems participating in automated demand-response programs might require:

  • Software patches to meet updated frequency deadband requirements
  • Changes to algorithms for new penalty structures (tiered penalties for repeated breaches)
  • Updates for compatibility with communication protocols with the National Energy System Operator (NESO)

2. Hardware degradation

Components like lithium-ion batteries in solar storage systems typically need:

  • Yearly capacity testing (most warranties require at least 85% capacity retention)
  • Cleaning of terminals every 6 months (prevents corrosion in UK’s humid climate)
  • Checks of cooling systems for heat-sensitive components

3. Software vulnerabilities

Recent cybersecurity requirements for UK grid-connected devices necessitate:

  • Security updates each month for internet-connected systems
  • Review of protocols when adding new smart appliances
  • Validation of firmware after major weather events (storms/floods)

Practical UK-specific examples

Solar+storage automation

  • Management of surplus solar charging: Requires the CT clamp sensors to be calibrated every three months to maintain accurate generation/demand balance
  • New Quick Reserve service (2025): Early adopters may need upgraded inverters to meet NESO’s sub-second response requirements

Business energy systems

  • Half-hourly settled meters: Mandatory compliance updates when switching to automated Demand Flexibility Service (DFS) participation
  • Submetering: Requires recalibration annually to maintain CHP (combined heat and power) efficiency certifications

Common mistakes to avoid

  • Ignoring Ofgem alerts: Missed grid code updates can invalidate FIT (Feed-in Tariff) payments
  • Flashing firmware without approval: Bypassing manufacturer approval risks non-compliance with the Smart Export Guarantee
  • Updating one component only: Focusing solely on inverters while ignoring battery management system (BMS) software

Proactive maintenance checklist

Task Frequency UK-Specific Reason
Security patch installation Monthly Mitigates OFCOM’s updated IoT device regulations
State of charge calibration Quarterly Maintains accuracy for new NESO frequency services
Weatherproofing inspection Bi-annually Addresses UK’s increasing extreme weather events
Ancillary service compatibility check Annually Prepares for Dynamic Regulation market changes

For homeowners participating in the Smart Export Guarantee, schedule professional inspections at least 3 weeks before your annual MCS certificate expiry. Businesses using automated NHH (non-half-hourly) settlement should align updates with Elexon’s BSC modification cycles (typically April/October).

bottom of page