top of page

See related products

See related products

What are the UK rules on building airtightness?

Are there any regulations in the UK regarding building airtightness?

Yes, the UK has specific airtightness regulations for buildings to improve energy efficiency and reduce carbon emissions. These apply to new builds, renovations, and retrofits under Building Regulations Part L (England and Wales) and equivalent standards in Scotland.


Key Regulations and Standards

Part L (England and Wales)

  • Current requirement: Maximum air permeability of 10 m³/h.m²@50Pa for new dwellings, measured via blower door tests.
  • Updated targets (2022): Reduced to <8 m³/h.m²@50Pa with mandatory testing for all new homes (no sample testing allowed).
  • Future Homes Standard (2025): Tightens further to <5 m³/h.m²@50Pa to support low-carbon heating systems like heat pumps.

Scotland

  • 2023 standards: New homes must meet Passivhaus-equivalent airtightness levels (typically <1.0 m³/h.m²@50Pa under strict certification).
  • Existing buildings: Retrofit projects increasingly follow airtightness strategies under evolving sustainability frameworks.

PAS 2035 for Retrofits

  • Scope: Applies to domestic energy efficiency retrofits (e.g., insulation, heating upgrades).
  • 2025 update: Mandatory airtightness testing for certain projects from March 2025 to ensure whole-building performance.

Testing Methods and Applications

  • Blower door tests measure air leakage at 50 Pascals pressure, simulating wind conditions.
  • When required:
  • New builds (mandatory for all dwellings since 2022)
  • Major renovations affecting thermal elements
  • Retrofit projects under government schemes (e.g., ECO4, Home Upgrade Grant)
  • Cost: Typically £300-£600 per test, depending on property size.

Practical Implications

Compliance Benefits

  • Energy savings: Airtight homes use 15-40% less energy for heating.
  • Ventilation: Requires compatible MVHR (mechanical ventilation with heat recovery) systems to prevent dampness.
  • Insurance: Non-compliant buildings risk invalidating warranties or insurance claims.

Common Mistakes

  1. Sealing gaps too late: Airtightness layers must be planned before installation of services (pipes, wiring).
  2. Over-reliance on tapes: Use compression seals and gaskets for long-term durability over adhesive tapes.
  3. Ignoring ventilation: Airtightness without proper airflow design causes condensation and air quality issues.

Recent Changes (2023-2025)

  • Scotland’s Passivhaus push: All new public housing now targets near-zero leakage.
  • Supply chain impacts: Builders must upskill to meet <5 m³/h.m²@50Pa targets by 2025.
  • Retrofit focus: PAS 2035:2023 prioritizes airtightness in energy upgrade plans to avoid poor execution.

Actionable Advice

  1. Before construction:
  • Specify airtightness targets in contracts
  • Use accredited testers from ATTMA or similar bodies
  1. For retrofits:
  • Combine insulation upgrades with air sealing
  • Test pre- and post-work to quantify improvements
  1. Post-build:
  • Monitor indoor humidity levels
  • Service MVHR systems annually

Failure to comply can lead to failed building control sign-offs, costly remediation, or reduced property value. Proactive planning ensures smoother compliance with evolving standards.

bottom of page